2014: First Major Industrial Solar Power Project

Industrial solar power: Cyclect completed its first major solar project in 2015 — a 2MW rooftop installation at Asia Pacific Breweries — beginning a renewable energy portfolio that has since grown to utility scale.
2015: Critical Facilities Management for Telecommunications Infrastructure

Telecommunications facilities management: Cyclect was appointed managing agent for SingTel’s telecommunications infrastructure in 2015, covering satellite stations and exchanges in a first entry into critical telecoms.
Electrical Works Completed at Singapore Sports Hub

Sports Hub electrical works: Cyclect completed electrical works across the 35-hectare Singapore Sports Hub, covering the National Stadium, aquatics centre, indoor sports hall and associated facilities.
Cyclect Completes Electrical and Mechanical Works at Lower Seletar Waterworks Project

Waterworks E&M works: Cyclect delivered electrical and mechanical works at PUB’s Lower Seletar Waterworks upgrade, maintaining operational continuity throughout a live water treatment facility.
Airport FOD Detection System Supports Runway Safety and Operational Reliability

FOD detection system: Cyclect developed and deployed FIDAS, a sensor-based runway FOD detection system with Changi Airport Group, recognised with the Prime Minister’s Office Innovator Award.
2009: First Trigeneration Project for Pharmaceutical Manufacturing

Trigeneration plant: Cyclect delivered Singapore’s first 10MW trigeneration plant for MSD International in 2009, generating electricity, heating and cooling simultaneously from a single system.
2008: Singapore Grand Prix Electrical Infrastructure Milestone

Singapore Grand Prix electrical: Cyclect delivered electrical and roustabout works for the Singapore Grand Prix from 2008 to 2017, supporting the world’s only F1 night race across ten consecutive editions on the Marina.
2008: Electrical Works for Major Integrated Resort Development

Integrated resort electrical: Cyclect delivered electrical works for Marina Bay Sands during construction and early operations, working across the hotel, casino, convention and retail components of the integrated resort.
2006: Ride and Show Installation Capability for Complex Attractions

Ride show installation: Cyclect developed Ride and Show Installation capability through specialist training for Universal Studios Singapore, applying decades of heavy-lift and precision electrical skills to complex.
1952: First Major Marine Electrical Contract

Marine electrical contract: Cyclect secured its first major contract with the British Royal Navy in 1952, servicing naval vessels in Singapore and establishing a marine engineering foundation that shaped the company’s.