Cyclect supports installation inspections, functional checks, integrated testing, defect rectification and handover documentation under the direction of the responsible OEM, designer and commissioning authority.
Installation verification
Systems are checked for completeness and readiness before functional testing.
Mechanical completion checks
Cable and connection testing
Utility-readiness verification
Labelling and identification
Punch-list preparation
Functional and integrated testing support
Equipment and interfaces are operated through approved procedures.
Manual and local functional checks
Interlock and safety-circuit verification
Control and communication checks
Show and attraction integration support
Test observation and record support
Defect close-out and handover
Outstanding work is controlled through final completion.
Fault and defect rectification
Adjustment and retesting
As-built and O&M document support
Training and vendor handover support
Final completion tracking